DERBY — It’s taken more than two years of permit wrangling and planning, but everything’s finally in place for the reconstruction of the Eagle Point Road bridge.

The bridge was closed in February 2017 after winter rains and snow melt washed out a large culvert at Halls Creek. The town installed a temporary bridge around the site to keep the road open to the half-dozen homes and cottages on the eastern shore of Lake Memphremagog.

0
0
0
0
0

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.